INTEG BOQ
| PROJECT : | MRT - 7 PROJECT | ||||||||
| LOCATION : | QUEZON CITY TO SAN JOSE DEL MONTE, BULACAN | ||||||||
| CLIENT : | SAN MIGUEL CORP. | ||||||||
| SUMMARY OF QUANTITIES FOR DETAILED ENGINEERING DESIGN (DED) | |||||||||
| MRT7 | |||||||||
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT COST (Pesos) | AMOUNT (Pesos) | REMARKS | |||
| INTEGRATION, AND TESTING AND COMMISSIONING OF MRT-7 STATIONS AND DEPOT ELECTRONICS NETWORKS | |||||||||
| Phase 1 (Stations to Depot-Admin Bldg- OCC Integration) | |||||||||
| Fire Detection and Alarm System (FDAS) Workstation Computer System (1123.2.8) Complete with the following: Workstation Computer (1123.2.8.A*) To use 32"' LED Monitor Server (for centralized FDAS management) (1123.2.8.B*) Software** (1123.2.8.C*) Network Switch (1123.2.8.D*) Uninterruptible Power Supply (UPS) (1123.2.8.E*) Peripherals (1123.2.8.E*) *Please refer Engineering Specification (Electronics) for Depot for the specific and other requirements requirements. ** Monitoring and Control Software, including graphical user interface shall have a perpertual license. | Lot | 1.00 | |||||||
| Access Control System (ACS) Workstation Computer System (1124.2.6) Complete with the following: Server Computer (1124.2.7*) L2 (Layer 2) Switch with SFP (Small Form-Factor Pluggable) Ports (1124.2.8*) Badge Printer (1124.2.12*) System Software **(1124.2.13*) System Database (1124.2.14*) *Please refer Engineering Specification (Electronics) for Depot for the specific and other requirements requirements. ** Monitoring and Control Software, including graphical user interface shall have a perpertual license. | Lot | 1.00 | |||||||
| Supply and installation of required network interface card and or other required media converter and gateways including software’s for the system integration. | ps | 1.00 | |||||||
| Supply and installation of Control and Communication Cable including related accessories to complete the system | ps | 1.00 | |||||||
| Supply and installation of Power Supply Cables including Conduit and Boxes and other related accessories to complete the system | ps | 1.00 | |||||||
| Table and Chairs for Admin-OCC | ps | 1.00 | |||||||
| Testing and commissioning | Lot | 1.00 | |||||||
| Phase 2 (Depot Buildings to Depot Admin Bldg-FCCR Integration) | |||||||||
| Supply and installation of Control and Communication Cable including related accessories to complete the system | Lot | 1.00 | |||||||
| Supply and installation of required network interface card and or other required media converter and gateways including software’s for the system integration. | ps | 1.00 | |||||||
| Supply and installation of Power Supply Cables including Conduit and Boxes and other related accessories to complete the system | Lot | 1.00 | |||||||
| Table and Chairs for Admin-FCCR | ps | 1.00 | |||||||
| Testing and Commissioning | Lot | 1.00 | |||||||